Process

How long does it take to import a car from Japan?

Eight to twelve weeks from winning the auction to driving the car. Here is where every one of those weeks goes, and which stages actually slip.

Area 9 JDM Imports · Updated 17 September 2026 · 6 min read

This is the question every first-time importer asks, and the honest answer annoys people: it depends, and anyone who gives you a firm date is guessing.

What you can have is a realistic range and an understanding of which stages are predictable and which are not.

The timeline, stage by stage

StageTypical timePredictable?
Finding the right car at auction1–4 weeksNo — depends on what comes up
Payment and export paperwork in Japan1–2 weeksFairly
Waiting for a sailing1–3 weeksNo — schedules vary
Sea passage to the UK4–6 weeksYes
Customs clearance and port release2–7 daysUsually
MOT and any modifications1–2 weeksYes
DVLA registration2–6 weeksNo — varies with their workload

Where the time actually goes

Finding the car is the wild card. Japanese auctions run several times a week with enormous volume, but you are looking for a specific car in a specific condition at a price that works. Sometimes that appears in the first week. Sometimes you bid on four cars and lose all four. Being flexible on colour and trim shortens this stage more than anything else.

Shipping is the most predictable part. Once a car is on a vessel, the passage takes what it takes. What is less predictable is waiting for a sailing in the first place, because a car that just misses one may wait a fortnight for the next.

The DVLA is the most frustrating part, because it is entirely outside anyone's control and their processing times move around. A complete, correct application is the only lever you have, which is why getting the paperwork right first time matters so much. Our registration guide covers exactly what to send.

The one that catches people

NOVA has to be completed with HMRC within 14 days of the vehicle arriving, and the DVLA will not register the car until it is cleared. An unresolved NOVA entry is the most common reason an import sits waiting, and it is entirely avoidable.

What makes it faster

  • Be flexible on specification. Insisting on one colour can add weeks at the auction stage.
  • Choose a car over ten years old. It needs only an MOT rather than an IVA test, which removes a whole stage.
  • Have the paperwork ready before the car lands. Insurance arranged, NOVA understood, garage booked.
  • Do not lose the export certificate. Without it the DVLA cannot establish the age of the vehicle, and that turns weeks into months.

What makes it slower

Customs inspections happen at random and add days. Port congestion at busy times of year adds more. Cars needing more modification than expected to pass an MOT add a week or two. And an incomplete DVLA application sends you to the back of the queue.

None of these are common, but at least one of them happens often enough that you should not book a holiday around your car's arrival.

So what should you tell people?

Eight to twelve weeks from a successful auction bid to a registered car on your driveway. Add a few weeks at the front if you are still hunting for the right car.

We give every customer a running update at each stage: auction result, vessel booking, sailing position, customs clearance and registration. You will always know where your car is, which is the part most people actually care about.

Common questions

How long does it take to import a car from Japan to the UK?

Typically eight to twelve weeks from winning the auction to driving a registered car. Sea passage alone is four to six weeks, with the rest going on export paperwork, waiting for a sailing, customs clearance, MOT and DVLA registration.

How long does shipping a car from Japan take?

The sea passage itself takes around four to six weeks by RoRo. You may also wait one to three weeks for a suitable sailing before the car is loaded.

Why is my imported car stuck at the DVLA?

The most common cause is an unresolved NOVA entry with HMRC, which must be completed within 14 days of arrival. The DVLA will not register a vehicle until NOVA is cleared. Incomplete paperwork, particularly a missing export certificate, is the other frequent cause.

Can importing a car be done faster than eight weeks?

Rarely. The sea passage alone is four to six weeks and cannot be rushed at sensible cost. Anyone promising a four-week turnaround is either quoting air freight, which is enormously expensive, or guessing.

Want one sourced for you?

Tell us the car, the budget and the spec. We bid at the Japanese auctions on your behalf, translate the sheet before you commit, and land it in the UK.